OpenArt Logo
Sign in

Jorge Pesantez

Jorge Pesantez

Model: OpenArt SDXL

Prompt:

generate a graphical abstract of a water distribution system
Width: 1024
Height: 1024
Scale: 7
Steps: 25
Seed: 1336952480
Sampler: DPM++ 2M SDE Karras

Create your first image using OpenArt.

With over 100+ models and styles to choose from, you can create stunning images.

More images like this
Prompt: Carbon Capture and Storage (CCS) in industrial setting, realistic digital rendering, industrial pipes and machinery, capturing CO2 emissions, futuristic green technology, high-tech gas network, professional, detailed, industrial, realistic, highres, digital, futuristic, green technology, CO2 capture, storage, industrial pipes, machinery, greenhouse gas-neutral, complementary measure, atmospheric lighting
Prompt: Illustration depicting water supply and sewerage
Prompt: generate a hydrogen energy storage system with gas turbine and electrolyzer
Prompt: Detailed infographic of wastewater treatment process, realistic digital illustration, high quality, informative, educational, step-by-step depiction, industrial color palette, technical, modern design, clear and label texts, clean and professional, water treatment, sewage processing, purification stages, biological, chemical, mechanical, environmental engineering, modern facilities, advanced technology, informative, professional lighting, industrial, technical illustration
Prompt: Green pipeline with three pipeline branching off the centre one connected to Fertiliser manufacturing plant and a glass manufacturing plant 
 3D format
Prompt: cartoon of an old fashion groundwater well, house and yard in the background, emphasis on the well not the house, no water showing,
Prompt:
Prompt: 
"Draw a technical diagram on a white background illustrating a water-lifting system using a counterweight, rack and pinion, and a Pelton turbine at the base for energy recovery. The system should include the following components: 

1. **Ground level** with a labeled 'Water Collection Tank' at the bottom left.
2. A **Transport Reservoir** vertically positioned on the right side of the Water Collection Tank, with a pulley and cable system connecting it to a **Counterweight** suspended 2 meters above ground.
3. A vertical **Rack and Pinion mechanism** next to the Transport Reservoir, connected to the Counterweight.
4. At the top, 3 meters above ground, a labeled 'Elevated Reservoir' connected by a slanted pipe (Conduit) descending towards a **Pelton Turbine** located on the ground near the Transport Reservoir.
5. The Pelton Turbine should be represented as a simple wheel with curved buckets.
6. Arrows should indicate the flow of water from the Elevated Reservoir, through the conduit, to the Pelton Turbine, and finally back to the Water Collection Tank. 
7. Clearly label each component and use bold lines to differentiate key parts."